+7 (495) 565-34-02
info@pso-ngd.com
Search defective areas on the ground by the results of in-line inspection
February 2016
"Surgutneftegaz", oil-and-gas production department.
December 2015.
Repair of "Asia Gas Pipeline" main gas pipeline using Smart Lock 1220
Oktober 2015.
Pilot test of UKM "Cone" in "Lukoil-Perm".
Installation supervision of Smart Lock 530 on LatRosTrans pipeline.
May 2015
GAZPROM Krasnodar gaz pipeline repairs.
Installation supervision of Smart Lock 32" on PETRODAR Operating Company pipeline.
Rehabilitation of AO "Achimgaz" pipeline Dn 377 .
August 2009
Lukoil-Komi. Repair of extended external corrosion defects on Dn 530 pipeline.
June 2009
Rehabilitation of 720 mm pipeline "Rosneft-Sakhalinmorneftegaz".