« Back 01.11.2010 07:21 "Four Smart Lock (UKMT) 377 were installed by the specialists of your company in August-September of this year in order to repair the three local defects admitted by the work management plan (WMP). Those defects were discovered based on results of smart pigging of the line section of the main product pipelines of 'Perm-Andreevka'. The defects were eliminated using continuous repair procedure implemented under severe in-field conditions without imposing any restrictions on operating modes of the pipeline and suspension of oil products transportation. Thus, considerable amount of time, manpower, material, technical, and financial resources were saved. Territorial Production Administration, the town of Perm
|